Zhuohang Precision Machining Factory

CNC Prototyping China Parts

CNC Prototyping China Parts — CNC Prototyping China is a Dongguan, China manufacturer of CNC machined parts — milled, turned, and mill-turn components in. Tolerances: ±0.003 mm milling, ±0.002 mm turning — ISO 9001 / IATF 16949 verified.

CNC Prototyping China is a Dongguan, China manufacturer of CNC machined parts — milled, turned, and mill-turn components in aluminum, stainless steel, brass, copper, and titanium. Every part carries a material-to-part traceability chain, so the part you validate is the part you can reproduce, held to ±0.003 mm (milling) / ±0.002 mm (turning) and backed by ISO 9001, IATF 16949, and ISO 14001.

At a glance
  • Traceable by design — every part links to its material lot, process parameters, machine, batch, operator, and inspection data.
  • 100+ production machines — 3-axis (50+), 4-axis (20+), 5-axis (20+), 25+ lathes, 7+ grinders across a 6,800 m² facility. ±0.003 mm CNC milling, ±0.002 mm CNC turning tolerance; ±0.002 mm grinding, verified on Hexagon CMMs.
  • MOQ 1 piece, lead times of roughly 3 / 7 / 30 days depending on complexity.

Which materials can this manufacturer machine, and how is each one verified?

You are not limited to one alloy family. The materials buyers actually specify on drawings are run here, and every incoming lot is verified by XRF against its mill certificate before it reaches a machine. That verification is the first link in the traceability chain — it is what guarantees the alloy you ordered is the alloy you receive, and it catches a mixed or mis-declared lot at the door instead of at your incoming inspection.

Material familyGrades runNotes for buyers
Aluminum6061, 6063, 6082, 7075, 2014Most common prototype and production choice; anodizes well
Stainless steel303, 304, 316, 316L, 17-4PH303 for free-machining, 316L for corrosion, 17-4PH for strength + aging
Carbon / alloy steel1018, 1045, 4140, 4340, 12L14Carburizing or nitriding available for wear parts
Brass / copperC360, H62, C110For electrical and thermal conductivity
TitaniumTA2, TC4 (Grade 2 / 5)Stress-relief above 500 °C is outsourced to a qualified partner
PlasticsABS, POM (Delrin), nylon, PTFE, PEEKFor non-metal prototypes and insulators

How does a part carry its traceability from material to shipment?

A machined part is a physical record of everything that happened to it, but only if that record is captured. Here it is, systematically: the raw material lot is verified and logged; the process parameters, machine, batch, machining time, and operator are recorded by the MES/ERP system as the part runs; and the CMM inspection data is attached to the batch before shipment. The result is a part that answers "what is this, who made it, and how do I make another" in a single connected record.

For buyers in automotive and other regulated industries, this is not a nice-to-have — it is what IATF 16949 audits exist to verify. The same discipline runs on every job here, not just the ones that formally demand it, because a part whose history is unknowable is a liability at any volume.

Which machining processes run in-house, and why does that matter for traceability?

Every time a part leaves the building for another operation, the traceability chain gets a seam. Keeping the core metal-cutting in-house keeps the chain unbroken — one accountable supplier, one system, one record from first cut to final inspection.

ProcessCapacityMax workpiece
3-axis milling50+ centers1300 × 700 × 600 mm (milling)
4-axis milling20+ centers
5-axis milling20+ centers
CNC turning25+ lathesØ720 × 1280 mm
Mill-turnMulti-task centers (Mazak / Brother class)Single-setup complex geometry
Grinding7+ (surface / centerless / cylindrical)±0.002 mm finishes

What tolerances does the manufacturer actually hold, and how is it proven?

Brass (C360) component machined on a CNC machining center, with the workpiece clamped in a precision vise.

A tolerance on paper means nothing without the measurement to back it. The tolerances are tied to the process, and every critical dimension is checked on a CMM rather than taken on faith.

ProcessHeld toleranceTypical use
CNC milling±0.003 mmHousings, brackets, prismatic parts
CNC turning±0.002 mmShafts, pins, bushings, round parts
Precision grinding±0.002 mmBearing seats, roundness-critical surfaces

These are held to process capability, not to a best-case claim. On a representative length characteristic (76.1–76.5 mm) the SPC shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim) against an initial-study target of Ppk ≥ 1.67. If a print calls out a dimension that cannot be reliably hit, it is flagged during the design-for-manufacturing review — before cutting, not after.

Read the tolerance band before you read the index. Cpk is a ratio of the tolerance band to the process spread, not an absolute measure of accuracy. The figure above was recorded on a length characteristic with a 0.4 mm band (76.1–76.5 mm) — wide by design. Hold the same process spread against a ±0.005 mm feature and it fails outright. Ask for the band, the subgroup count and the sampling window on every capability number a supplier quotes.

Which certifications back the traceability and quality system?

Certifications are your cheapest pre-audit: they tell you a shop already runs a documented, third-party-surveilled system. Three are held, with scope stated honestly.

StandardCertificate numberScope
ISO 9001:2015116024/A/0001/UK/EnMachining of metal parts
IATF 16949:2016131941/A/0001/SM/EnManufacture of CNC metal machining parts (excludes product design, Clause 8.3)
ISO 14001:2015116024/B/0001/UK/EnEnvironmental management related to machining of metal parts

Honest scope note: IATF 16949 excludes product design under Clause 8.3. This is a build-to-print manufacturer — if a program requires ownership of design responsibility, say so up front and the scope will be set accordingly rather than over-promised.

What are the MOQ and lead times, and what sets the lead time?

Zhuohang Precision Machining Factory CNC machining factory in Hengli Town, Dongguan
6,800 m² facility in Hengli Town, Dongguan

There is no forced production minimum. The MOQ is 1 piece, so a design can be prototyped, validated, and iterated before volume. Lead time is set by part complexity and the number of process steps, not by a blanket promise.

ComplexityApprox. lead timeTypical profile
Simple~3 daysFew operations, single material, no finishing
Standard~7 daysMultiple operations, standard tolerances
Complex~30 days10–20 process steps, or surface finishing / heat treatment

Complex parts can run 10–20 process steps, and any surface finishing pushes a part into the longer tier. State the target date and the honest answer on whether it holds will come back, not the other way around.

Which secondary operations can be bundled without breaking the traceability chain?

Parts ship finished, not as machined blanks. Secondary operations run in parallel or through qualified partners, so there is one invoice and one accountable supplier.

What do the material grades actually mean — your guide to 6061 vs 7075 vs 316 vs 4140?

Grades are the language of the drawing, and each one is a different answer to the same question: what does this part need to survive. The grade you call on the print is the grade the mill certificate must state, and the grade the XRF must confirm at the door.

GradePublic characterWhen you reache for it
6061-T6General-purpose, good corrosion, anodizes wellHousings, brackets, plates
7075-T6High strength, lower corrosion resistanceLoaded structural parts
5052Good formability and corrosion, moderate strengthCovers, enclosures
304Austenitic stainless, general corrosionGeneral fittings
316Adds molybdenum for better corrosionFluid-contact and marine parts
4140Heat-treatable alloy steelShafts, gears, wear parts

The classic failure the chain exists to catch is a substitution — a "316" that is actually 304, or a "7075" that is a mixed or mis-declared lot. The grade name alone is not protection; the mill certificate plus the XRF check is. When the grade, the certificate, and the physical bar all agree, the material question is closed.

Which part geometries suit which process, and how does the part carry its history?

Geometry chooses the process. Round parts with critical diameters go to turning; prismatic parts with pockets, slots, and holes go to milling; parts with both go to mill-turn; surfaces that must be tighter or smoother than machining alone can hold go to grinding. The process then becomes the spine of the record — every step the part takes is a line in its history.

The part carries its history in the record, not on the metal, which is why the record has to be tied to the batch number that ships with the part. A machined part without a batch tag is a part whose history has been orphaned: it may be perfectly made, and still unaccountable. The batch tag is the thread that connects the metal in your hand to the file that describes how it was made.

How does a buyer verify the material of the part in hand, not just the paperwork?

You have two checks, and they are independent. The mill certificate is the paper: it states the grade, heat number, composition, and mechanicals for the lot. Your own check is the metal: a composition reading at your incoming inspection, or a trusted third party's, confirms the physical part matches the paper. The paper says what the lot should be; the metal confirms what actually arrived.

Ask for the heat number on the packing list or the part tag where practical, so the box can be matched to the certificate. The chain's last mile is the box: if the tag and the certificate do not agree, the chain broke at the dock, no matter how careful the shop was upstream. The cheapest place to catch that break is your incoming dock, not the assembly line.

What surface finish and plating does a finished part need?

The finish is chosen by the environment the part will face: corrosion, wear, conductivity, or appearance. Standard and hard anodizing build an oxide layer on aluminum; zinc, nickel, silver, gold, and chrome plating deposit a metallic layer; powder coating and painting protect and color; brushing and mirror polishing set the appearance and the Ra.

The finish is a recorded step, not an assumption. Coating thickness is measured and attached to the batch, and a polished surface ships with its Ra reading. A part that was finished and left undocumented is a part whose surface is a rumor. The finish matters because it is often the part's first line of defense, and because a finished surface is the hardest thing to re-verify once the part is buried in an assembly.

How do part features change cost and the record?

Threads, thin walls, deep pockets, and sharp internal corners each add a process step or a special tool, and each step is a line in the record. A part with a deep, blind threaded hole is a part with extra operations, extra inspection points, and a longer history. The feature list drives cost and record length together.

FeatureWhat it addsTraceability note
Deep / blind threadsSpecial taps, more operationsEach thread op is a record entry
Thin wallsChatter risk, extra careStability checks logged
Deep pocketsLonger tools, more passesTool and program logged
Sharp internal cornersSpecial tooling or EDMExtra step flagged in DFM

The DFM review flags these before metal is cut, and the flag becomes part of the record. A part that arrives with a surprise operation is a part whose history has a step you never approved. The feature list is where cost and traceability meet, and the review is where they are both settled on paper.

How does a machined part ship, and what documents prove what it is?

A machined part ships with its identity in a document set: the dimensional report with measured values and the batch number, the material certificate with the heat number, the packing list, and any PPAP or SPC documentation you requested. That set is the traceability chain made portable — the part and its proof travel together.

Confirm the batch number ties the report to the parts in the box. The documents are not decoration; they are the part's accountability once it leaves the shop. A part that arrives with the wrong batch number on its report is a part whose proof belongs to someone else. Check the numbers at the dock and the chain is complete from the first cut to your shelf.

What this shop actually runs

We machine every part in our own 6,800 m² plant in Dongguan, China, on 100+ CNC machines with 100+ staff. The machine list by category:

  • 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Dedicated to compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
  • 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Dedicated to prismatic parts, plates, brackets, housings.
  • Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Dedicated to long, slender rotational parts at ±0.002 mm.
  • CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Dedicated to shafts, bushings, flanges up to ±0.002 mm.
  • Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Dedicated to hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
  • Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
  • Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.

Tolerance: ±0.003 mm CNC milling / ±0.002 mm CNC turning / ±0.002 mm grinding and wire EDM. Capability: Ppk >= 1.67 initial on key characteristics, Cpk >= 1.33 ongoing.

Certificates: ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, with design clause 8.3 excluded, stated openly) and ISO 14001:2015 (116024/B/0001/UK/En), issued to Dongguan Zhuohang Ltd, registration 91441900MA4UWT6X39, founded 2005.

Where we ship: Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa — plus other countries and regions worldwide, shipped from our base in Dongguan, China.

Contact: Felipe Iglesias, [email protected], +86 13126536955.

Ready to order machined parts you can trace?

Send your drawing to [email protected] or call +86 13126536955 for a DFM review and quote.

Frequently Asked Questions

Which materials can you machine into parts?

Aluminum, stainless steel, carbon and alloy steel, brass, copper, titanium, and magnesium, plus engineering plastics. Incoming lots are XRF-checked against the mill certificate so the alloy you specify is the alloy you receive.

Can each part be traced back to its material and process?

Yes. Our MES/ERP system links every part to its raw material lot, process parameters, machine, production batch, operator, and inspection data, so a non-conformance can be isolated to the exact affected parts.

What tolerances can you hold on machined parts?

In short, ±0.003 mm on CNC milling, ±0.002 mm on CNC turning, and ±0.002 mm for precision grinding. Critical dimensions are verified on Hexagon CMMs, with process capability Ppk ≥ 1.67 at the initial study on key characteristics and Cpk ≥ 1.33 on general characteristics.

What is your minimum order quantity?

Our MOQ is 1 piece. We take prototype and single-part orders as well as production runs, so you can validate a part and its traceability record before committing to volume.

Are you certified?

Yes. We hold ISO 9001:2015, IATF 16949:2016, and ISO 14001:2015. IATF 16949 scope excludes product design under Clause 8.3.

What are your typical lead times?

Roughly 3, 7, or 30 days depending on part complexity and process steps. Simpler parts ship in about 3 days; parts with surface finishing or many operations fall into the longer 30-day tier.

Do parts ship with inspection reports?

Yes. CMM inspection reports, SPC charts, and the material certificate ship with your parts, giving you documented evidence of what you received and how it was made.

How do I get a quote?

Email your STEP, IGES, or 2D drawing to [email protected]. We return a design-for-manufacturing review and a quote, flagging any traceability or tolerance issues before you commit.

How do I verify the material of the parts I receive?

In short, Match the heat number on the packing list or part tag to the material certificate, and run your own composition check at incoming if you need independent confirmation. The certificate states the grade and mechanicals; the tag ties the box to that lot.

Which part features add the most cost, and why?

Deep or blind threads, thin walls, deep pockets, and sharp internal corners. Each one adds a process step or a special tool, and each step is a line in the part's record — the DFM review flags them before cutting.

Standards referenced on this page

  • ASTM B211/B211M-19 — Standard Specification for Aluminum-Alloy Rolled or Cold Finished Bar, Rod, and Wire
  • ASTM A276/A276M-17 — Standard Specification for Stainless Steel Bars and Shapes
  • ISO 9001 — Quality management systems — Requirements